Construction change orders without the paper chase
Change orders are the lifeblood of construction. And the paperwork is the nightmare.
Traditionally, a change order requires a site visit, a handwritten note, a typed form, a fax or email, and a signature that may take days to arrive. By then, the work is already done and the risk is already taken.
ClarAccord changes the workflow. On site, snap a photo of the change. Generate a receipt with scope, cost, and timeline. The client signs with a one-time code before you leave.
The receipt is in your archive before you drive back. It includes the photo, the GPS location, the timestamp, and the client's digital signature. No lost paper. No delayed approvals. No unpaid work.
For contractors who work on thin margins, this is not a convenience. It is survival.